Projects

PETROFAC INTERNATIONAL LTD.

  • Project: LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM PHASE-1 (60 MBOPD)
  • (From DEC. 2017 to MAR 2018)
  • Piping Designer (Auto Cad)
  • Preparation of Piping layouts, Plan &

Value engineering services LLC. (Oman)

  • (From JUNE 2017 to AUGUST 2017)
  • Prepare As built
  • Preparing PEFS, preparing plot plans and piping
  • Worked on site 1.GGP, 2. SNGP

Sterling & Wilson Pvt Ltd.

  • (From JUNE. 2018 to NOV. 2018)
  • Preparing P&ID, preparing plot plans and piping plan
  • Piping isometric & GA drawing
  • Worked on
  • Serum India (Hadapsar), Pune
  • Henkel (Kurkumbh), Pune

Plant Route Pvt Ltd.

  • Project: ETP PLANT, MEPPDA, MMDPA.
  • Role of mine in above project as a DESIGN ENGINEER.
  • Preparation & Checking of Equipment layout, Civil layout, Piping
  • Preparation & Checking Isometric; its MTO
  • Modification into Existing as per client
  • Preparation of Pipe Supports, Support Dra